Reality check. Having put in a half mile long driveway, septic, well, electric, phone, internet, 3000 gallon water storage tank, pole barn, garage as well as the house itself, it’s going to take them a few years.
Planning and zoning and permits alone will take at least a year.
We have a windows like that. I had to put a couple screws in it from the outside to keep the cat from pushing it out. He would sit in that windows for hours.
My situation is the same as yours, always wore glasses before surgery and choose to wear them after for additional clarity. The only issue is reading. I prefer to use cheaters to read because I can use the entire lens rather than just the bottom few centimeters. That means keeping multiple pairs of cheaters around the house and switching glasses whenever I am reading anything longer than a few paragraphs.
Our house has 4 of them. When we had the house built they wired every ceiling fan with 2 lines – one to power the fan and a separate one to power a built in light fixture. None of our fans have lights attached so we have 4 blank switches.
It was the merger of Boeing and McDonnell Douglas that allowed the bean counters at McDonnell Douglas to take over management of the company and create all the problems you see today.
“Lola” is a comic strip by Todd Clark.