    Always add 30% to schedule and budget. Give wife controlling vote on all modifications.

     •  Reply
  2. Missing large
    jbrobo Premium Member over 4 years ago

    And she always has control of the colors.

     •  Reply
  3. P1000380
    A# 466  over 4 years ago

    Contractor’s axiom: The first 90% of the job takes 90% of the time; the last 10% of the job takes 90% of the time.

     •  Reply
  4. Calvin   hobbes   playtime in snow avatar flipped
    Andrew Sleeth  over 4 years ago

    I’d be wary of any construction company that issues soup bowls for hard hats.

     •  Reply
  5. Missing large
    Ukko wilko  over 4 years ago

    Cheap company – uses soup bowels for hard hats.

     •  Reply
  6. Atheism 007
    Michael G.  over 4 years ago

    Close enough for government work?

     •  Reply
  7. Missing large
    Bill The Nuke  over 4 years ago

    Bonuses for finishing early don’t work as well as penalties for finishing late.

     •  Reply
  8. Nomagram
    COL Crash  over 4 years ago

    No construction project is ever completed as soon as they told you it would and for anything close to the original cost estimate.

     •  Reply
  9. Missing large
    oldlady07 Premium Member over 4 years ago

    A word from the other side – a plumber told me it took him way longer to finish a project because the architect, kitchen designer, interior designer, and then the owner would come in and insist on changes.

     •  Reply
  10. Img 1610
    WCraft Premium Member over 4 years ago

    Hey, wasn’t that guy formerly the construction crew chief on an Illinois road repair crew?